A post-construction review serves to confirm the interim BREEAM rating achieved at the design stage in accordance with the reporting and evidential criteria of the technical guidance. Where a formal interim design stage assessment has not been carried out and a BREEAM assessment and rating is required, a full post construction stage assessment can be conducted. See "Assessment Stage".